Temporary Camp Infrastructure — Bolesławiec, Poland (2022–Present)
Ongoing DFAC and administrative camp — insulated shelters, HVAC, electrical and fire systems still in operation.
- Completed
- 1 January 2025
- Client
- US Government / US Army
- Location
- Bolesławiec, Poland
- Services

Since 2022, DSG Bulgaria has been supporting military operations in Bolesławiec, Poland, through the delivery and installation of complete temporary camp infrastructure. The project includes Berry Amendment-compliant modular shelter systems with double-wall construction, an additional insulation layer, cassette flooring, HVAC, electrical distribution, and fire detection systems.
The facilities were configured to support dining operations (DFAC) and administrative functions, providing durable, climate-controlled spaces designed for continuous use. Still operational today, the project demonstrates the long-term reliability, quality, and performance of DSG Bulgaria's expeditionary infrastructure solutions in demanding military environments.





